Cedardale Park Lifecycle Renewal

Aug 26, 2025 | Park projects

Location: 29 Mary Drive, Gloucester (Cedardale Park)

Project Type: Park Infrastructure – Playground Lifecycle Replacement

Developer/Lead Agency: City of Ottawa (Parks, Recreation and Cultural Services)

Project Overview

Lifecycle replacement of playground and swing equipment at Cedardale Park, including upgrading the play structure and swings with accessible design features. The project will incorporate engineered wood fiber as protective surfacing material to meet accessibility requirements and include an accessible pathway connecting the road to the play area. Based on community feedback, the project will also include replacement of an existing bench and picnic table.

Current Status: COMPLETED

Phase: Construction was Completed in the Fall of 2025 with the Park now ready for public use.

Progress Update: Community consultation has been completed with strong public support. Concept A (orange and green design) was selected for the play structure and Concept B (belt, infant and bucket swings) was chosen for the swing equipment. Detailed design has been finalized.

Timeline: Construction Completed Fall 2025